←Search results

By relevance · Total 2011 results Clear search

Saturday

Friday

Thursday

  1. A6 a6-051 · Cerebras:Blog

    Cerebras: Latency Debt Is Dragging Down AI Experience, GPUs Have Hit a Bottleneck

    Cerebras proposes the concept of "latency debt": model parameters have grown from 340M in BERT-Large to over 1T in Kimi-k2, the share of inference tokens has risen from under 10% to over 50%, context has expanded from about 1,000 tokens in GPT-2 to 10 million tokens, input length has doubled every year and output has tripled, causing latency to accumulate continuously. Cerebras says its Wafer-Scale Engine (WSE) keeps data on-chip, eliminating the memory bandwidth bottleneck of GPU inference, and OpenAI has already purchased 750 MW of compute from it.

    Cerebras proposes the concept of "latency debt": model parameters have grown from 340M in BERT-Large to over 1T in Kimi-k2, the share of inference tokens has risen from under 10% to over 50%, context has expanded from about 1,000 tokens in GPT-2 to 10 million tokens, input length has doubled every year and output has tripled, causing latency to accumulate continuously. Cerebras says its Wafer-Scale Engine (WSE) keeps data on-chip, eliminating the memory bandwidth bottleneck of GPU inference, and

    Matched fieldsBody

  2. A6 a6-047 · Baseten Engineering Blog

    Baseten AI Engineering Blog: MCP and Skills, DeepSeek Harness, Qwen3-TTS Fine-Tuning, and More

    The Baseten engineering blog has released new MCP and Skills for coding agents, enabling coding agents to use Baseten directly. The blog also covers how to run any open-source model in DeepSeek Harness, fine-tuning Qwen3-TTS for high-quality voice cloning, and running Kimi K3, GLM-5.2, and more in any harness.

    Matched fieldsBody

Tuesday

  1. Data Center Knowledge

    The 200 GW Moment: Reshaping the Power Grid for the AI Economy

    Global data center power demand is projected to exceed 200 GW by 2030, and AI workloads are pushing typical rack densities from about 10-30 kW to 80-150 kW, with advanced deployments approaching 1 MW per rack. At Data Center World Power in Dallas, utilities, hyperscalers and developers discussed how to expand power supply while safeguarding grid reliability, increasingly adopting hybrid solutions combining the grid with on-site generation and energy storage.

    Matched fieldsBody

Wednesday