Oracle CDS Spread Rises to 316 Basis Points; Groundbreaker Says 40% of Equity in AI Data Center Campuses Has Been Wiped Out
A Groundbreaker report says Oracle’s five-year CDS spread has risen to 316 basis points. After revaluing a sample of 25 AI data center campuses, it found that about 40% of owners’ equity has been wiped out. The sample’s total cost was approximately $207 billion. Changes in CDS spreads alone reduced collateral values by about 16%; factoring in the rise in the 10-year U.S. Treasury yield to 5%, the decline was about 24%. Equity losses behind Oracle and CoreWeave projects were 72% and 91%, respectively. The report argues that highly leveraged construction depends on the creditworthiness of tenants and guarantors, and that wider CDS spreads can depress campus valuations and restrict subsequent financing even before a default occurs.
Why read this
SelectedAI score 81
The report revalues 25 AI data center campuses using CDS-implied ratings, showing how widening credit spreads are magnified by high leverage into equity losses.
Topics
Body · AI translation
The credit underpinning AI infrastructure financing is beginning to show cracks on traders’ screens: Oracle’s five-year credit default swap (CDS) spread has widened to 316 basis points, exceeding Bear Stearns’ level on January 1, 2008. The spread implies a five-year default probability of about 23%, versus just 6% a year ago.
A study published by independent credit researcher Groundbreaker, titled “Mark to Swap: How the Market is Mispricing the AI Boom,” provides more specific figures. Using a sample of 25 AI data center campuses with relatively extensive disclosures, and revaluing them based on tenants’ CDS spreads rather than credit agency ratings, about 40% of owners’ equity has been wiped out—72% for projects backed by Oracle and as much as 91% for those backed by CoreWeave. These assets, with a total cost of about $207 billion, have seen their collateral value fall by about 16% solely because of spread movements, or roughly 24% after factoring in a rise in the 10-year U.S. Treasury yield to 5%.
The rift between the market and rating agencies lies at the heart of this argument. Since the end of June, five-year CDS spreads have widened by about 155% for Broadcom, 130% for Nvidia, 80% for Oracle, 60% for Meta, and roughly doubled for CoreWeave; over the same period, the investment-grade CDX index widened by only about 22%. The rating agencies’ entire response has been S&P’s one-notch downgrade of Oracle from BBB to BBB- on July 9.
Most of these CDS contracts only began trading a little over a year ago: CoreWeave’s around late September 2025, Meta’s around its $3 billion bond issuance in late October, and Nvidia’s in November. Thirteen months later, all are near their widest levels on record.
CDS market repricing has only just begun
Since the end of June, five-year CDS spreads have widened by about 155% for Broadcom, 130% for Nvidia, 80% for Oracle, 60% for Meta, and roughly doubled for CoreWeave. Measured from January 1, the increases are 315% for Broadcom, 214% for Nvidia, 114% for Oracle, and 104% for Meta, while the investment-grade index has risen only about 22% over the same period.
In terms of default probabilities, Oracle’s spread of 76 basis points a year ago corresponded to a five-year default probability of about 6%, while today’s 316 basis points correspond to about 23%; CoreWeave’s 1,145 basis points correspond to about 61%.
Under Moody’s two-decade-old methodology for deriving implied ratings from CDS, the investment-grade cutoff is around 135 basis points. Applying this methodology to every tenant and guarantor with traded CDS, issuers that have both agency ratings and traded CDS carry CDS-implied ratings averaging 5.3 notches below their agency ratings. Microsoft (AAA) maps to A+, Meta (AA-) to BBB-, and Nvidia—which S&P upgraded to AA in June—to BBB-, only about six basis points away from junk status. Broadcom, SpaceX, and Oracle are investment grade on paper but trade at levels consistent with high-yield ratings; CoreWeave, rated B+, trades at a level corresponding to CCC-.
The rating agencies have responded with only one adjustment: S&P downgraded Oracle from BBB to BBB- on July 9. Over the past 14 months, Oracle’s CDS-implied rating has fallen eight notches, from A to B+.
“Renting out ratings”: speculative-grade demand packaged as investment-grade debt
The report’s central argument is that OpenAI, Anthropic, and neocloud providers cannot finance campuses on the strength of their own credit. The debt is marketable only because they borrow the names of stronger entities: Oracle serves as the named tenant for Stargate campuses; Nvidia guarantees OpenAI’s lease in Ohio; Google provides backstop support for campuses that Fluidstack leases to Anthropic; Broadcom supports Anthropic’s chip-financing vehicles—Apollo/Blackstone special-purpose entities; and Meta provides residual-value guarantees for its own off-balance-sheet campuses.
The report compares this to the bond insurers MBIA and Ambac in 2007, which rented out their AAA ratings to securities that could not earn those ratings on their own. Whether the motive is to sell chips, participate in the boom, or keep assets off the balance sheet, the effect is the same: speculative demand from frontier labs is transformed into investment-grade debt.
Weighted by debt, signed leases, and guarantees, about $2.2 trillion of rated obligations average a single-A agency rating, with roughly 5% classified as high yield and a weighted default probability of about 5%. On a CDS basis, the default probability rises to about 13%, corresponding to BB+, with 30% classified as high yield. Including the two labs at spreads derived from the report’s structural model—BB for Anthropic and BB- for OpenAI, treating non-cancelable compute commitments as debt—expands the total to about $3.5 trillion, rated BB, with more than half classified as high yield.
For comparison, at the end of February 2007, Moody’s market-implied ratings placed Goldman Sachs, Morgan Stanley, and Merrill Lynch five notches below their agency ratings, and Lehman Brothers and Bear Stearns four notches below, for an average gap of 4.6 notches. By the end of July, all four traded as high yield, averaging 6.5 notches below their agency ratings. The current AI buildout lies somewhere between those two points.
A data center is a bond with a building attached
The value of a leased data center property equals the present value of its rent, while the value of that rent depends on the tenant’s creditworthiness. These campuses are financed through credit-tenant leases: loan amounts are determined by rent, pricing is based on the tenant’s rating, and the building itself serves primarily as downside protection. Groundbreaker cites Carlyle’s Jason Thomas telling Bloomberg in September that campuses are financed on the credit of the guarantor rather than their own economics; it also cites a Clifford Chance briefing from July titled “Data Center Leases Are Bonds,” as well as Moody’s acknowledgment in February that lenders are effectively taking hyperscaler risk rather than bricks-and-mortar risk.
Therefore, when the market reprices a tenant’s credit, the campus’s value falls with it, without a single rent payment having to be missed. Because the debt is fixed while the value fluctuates, equity takes the first hit: at 70% leverage, a 10% decline in value wipes out one-third of the equity.
The report’s valuation formula is: market-implied capitalization rate = 10-year U.S. Treasury yield + credit premium + building premium − expected rent growth; where credit premium = CDS spread ÷ (1 − unsecured recovery rate) × (1 − building recovery rate). The parameters assume a 40% unsecured recovery rate and a 50% building recovery rate.
The model’s back-tested results closely match actual market transactions: KBW valued the Core Scientific leases at a 6.7% capitalization rate for the single-A-rated AMD lease and 9.2% for the single-B-rated CoreWeave lease, while the model produces 6.63% and 9.23%, respectively. Blackstone’s BXDC acquired two AWS-leased powered shells at a 7.0% capitalization rate, exactly matching the result calculated using Amazon’s AA rating and a 5% 10-year Treasury yield. Based on CoreWeave’s current CDS, the capitalization rate for the same lease would be about 16%.
Valuing the same campus using the tenant’s actual CDS rather than its agency rating makes it worth about 4% less with Microsoft behind it, 19% less with Oracle behind it, and 45% less with CoreWeave behind it. No Oracle-backed campus has yet traded to validate that price. Both owners and lenders are waiting for a comparable transaction, just as subprime debt holders were in 2007.
Valuations of 25 campuses: 40% of equity has already disappeared
The report selected 25 AI campuses with relatively complete disclosures of leases, guarantees, financing, and costs—representing a total cost of about $207 billion—and revalued each using the tenant’s CDS at signing and today. The result: CDS changes alone reduced collateral value by about 16%, and the decline reaches about 24% when combined with a rise in the 10-year Treasury yield to 5%. The four CoreWeave campuses lost about 45% of their value, while Oracle-backed campuses fell by roughly one-quarter to one-third after the 10-year yield was factored in.
The corresponding equity losses are 40% for the 25 campuses as a whole, 72% for those backed by Oracle, and 91% for those backed by CoreWeave. Based on current CDS levels, four of CoreWeave’s six campuses are already worth less than their debt; after accounting for the increase in the 10-year Treasury yield, three of Oracle’s six campuses are also underwater.
The repricing path is not one-way. Polaris Forge 1, the North Dakota campus that Applied Digital is building for CoreWeave, lost about one-quarter of its value early in the year, recovered most of that loss over the summer as CoreWeave’s spreads narrowed, and is now down 42% and worth less than its loan balance. The Oracle-backed Abilene and Frontier campuses, meanwhile, have steadily declined by about 26% and 24%, respectively.
A valuation markdown becomes an actual loss only if the tenant defaults, the owner is forced to sell or refinance, or a sponsor whose equity has been exhausted hands over the keys. But pressure emerges long before then: construction requires additional funding every quarter, and new capital is priced against the latest valuation. Banks that cannot sell loans at par will stop making new ones.
Leveraging “certainty”: loans equal to 95% of the cost of unfinished buildings
Equity losses are magnified because campuses are leveraged on the assumption that their leases provide certainty, while leverage rises as tenant credit deteriorates. Morgan Stanley data show that the median loan-to-cost ratio for data center bond transactions increased from about 72% in the fourth quarter of 2025 to approximately 88% in the third quarter of 2026. Over the same period, the average CDS spread of major tenants rose from about 156 basis points to 237 basis points, equivalent to a downgrade from BB+ to BB.
Every loan is priced using unchanged agency ratings, and those ratings also determine who may buy the bonds. In February, banks marketed more than $56 billion of investment-grade-rated construction loans tied to Oracle leases—an investment-grade rating is relatively unusual for construction debt—so that insurance companies and private credit funds could take them on. Of the 25 campuses, 12 borrowed at least 85% of cost, while River Bend, Stingray, and Sandersville borrowed between 92% and 95% of cost. A 95% loan-to-cost ratio means the sponsor used twentyfold leverage.
At The Barn, the Michigan campus Related Digital is building for Oracle, CDS changes alone erased 24% of the value and nearly 90% of the development profit; after factoring in a 5% 10-year Treasury yield, its value is already below cost. Helios II, backed by CoreWeave, is down 42% and is already worth less than its loan balance.
The industry’s standard defense is that the leases are “already signed.” The report’s response is that signing before construction begins eliminates vacancy risk but retains all the credit risk. In economic terms, a signed lease for a project on which construction has not begun is equivalent to a forward-starting credit swap and has a mark-to-market value from the date it is signed; such a lease backlog is a portfolio of forward-starting credit swaps, and the landlords and their lenders are long that portfolio from day one.
Moreover, the CDS calculation may be generous: it does not account for the exit provisions developers secure in each lease—force majeure, termination for delay, acceptance testing, paid exit rights, and trigger-based guarantees—which are worth far more to Oracle at 316 basis points than at 76 basis points. Litigation firm Quinn Emanuel warned earlier this year that disputes over take-or-pay provisions would be among the industry’s earliest and costliest battles. The report likewise argues that the first catalyst exposing the mispricing is more likely to be a dispute over, or renegotiation of, a clause than an outright default.
The constraint is debt-carrying capacity, and CDS prices it every day
The discussion above concerns the valuation of existing campuses. The more important implication is how many future projects will be unable to break ground.
Under agency ratings, a campus is worth its cost, lenders provide 80%, and the sponsor contributes 20% in equity; $10 billion of equity can support roughly 3.6 gigawatts of capacity behind any tenant. If lending were based on CDS-implied values, the same capital would build 41% less capacity behind Oracle and 63% less behind CoreWeave. The report therefore concludes that the hard constraint on AI construction is debt-carrying capacity, and debt-carrying capacity is a function of tenant CDS. The entire buildout can slow without a single customer canceling an order.
The natural response is to shift new capacity onto balance sheets whose spreads remain relatively narrow. But every campus a hyperscaler takes on causes its own CDS to widen: during the year in which Meta provided residual-value guarantees for $39.8 billion of campus debt for Hyperion and El Paso, its CDS rose from about 45 basis points at the time of the first transaction to 120 basis points; during the year in which Nvidia agreed to support OpenAI’s Ohio campus, its CDS rose from about 35 basis points to 128 basis points. Concentrating construction on the strongest balance sheets consumes the credit quality that attracted the projects in the first place and reduces the value of guarantees already issued. Goldman Sachs’s credit trading desk noted two weeks ago that CDS on a basket of chip stocks had widened beyond hyperscaler CDS for the first time.
The credit problem will thus evolve into a macroeconomic problem. Economists at Apollo and the Economic Policy Institute estimate that AI capital expenditure and the associated wealth effects account for 40% to 65% of U.S. GDP growth, compared with 28% for the IT sector at the peak of the dot-com bubble. Growth depends on changes in investment, so even a buildout that merely stops accelerating will drag on growth.
As for the labor market, Goldman Sachs estimated in May that AI was reducing U.S. employment in affected industries by a net 11,000 jobs per month, with most of those losses offset by data-center construction—which has added about 212,000 jobs since 2022. Stagnant capital expenditure would remove that offset, hitting electricians, transformer and switchgear factories, utilities, and consumption supported by the wealth effect from AI stocks.
Breaking points: Nvidia Bank, fallen angels, and the sacrifice layer
The report identifies three fault lines.
First, Nvidia Bank. Over the past year, Nvidia has become the lender of last resort for the AI buildout, stepping in when neocloud providers cannot borrow or OpenAI cannot find a landlord. But each guarantee increases Nvidia’s contingent liabilities and pushes up its own CDS, while wider CDS in turn reduces the value of guarantees already issued. At 129 basis points, Nvidia CDS prices this “bank” at BBB-, on the edge of junk status; it touched 145 basis points when news of Jensen Huang’s resignation was announced.
Second, fallen angels. If rating agencies close the gap, AMD, Broadcom, SpaceX, and Oracle—the four investment-grade issuers already trading as junk—will be removed from investment-grade-only indices and portfolios. Oracle is just one notch above high yield and SpaceX two notches above it, while both companies’ CDS trade at B+. Capital requirements would follow: a life insurer must hold about $2.17 of capital for every $100 of Oracle bonds at BBB-, but about $7.39 at the B+ implied by its CDS, or 3.4 times as much; across the buildout chain, the multiple ranges from 3.4 to 7.5 times. This means insurers buying AI debt based on its stated rating hold less than one-third of the capital required by CDS pricing.
Third, the sacrifice layer. In the subprime crisis, the first legal casualties were not borrowers but intermediaries: New Century filed for bankruptcy on April 2, 2007, long before most of its borrowers defaulted. In the AI buildout, the parties in economic default will be the labs unable to fulfill their commitments; the parties in legal default will be the neocloud providers unable to pay rent to landlords or the landlords unable to pay interest to lenders. They hold short-term receivables contracts but borrow on the assumption that the contracts will be performed in full, while taking on long-term lease obligations. Once a lab delays payment, their revenue stops while their coupons continue. Because they hold no equity in the labs, they are also the easiest counterparties to cut loose.
“Contained”
On March 28, 2007, Bernanke told Congress that the impact of subprime debt on the broader economy “seems likely to be contained.” His assessment had some basis if one looked only at defaults, because subprime debt made up a small share of household debt. What he overlooked was repricing—the ABX index had already been running for months, reflecting assets that were correctly rated according to the prevailing framework and leveraged on that basis.
The report argues that the same reasoning can be heard today: Oracle is just an overextended balance sheet, CoreWeave is merely a neocloud leverage story, and the hyperscalers are among the strongest credits in the world. Meanwhile, Kansas City Fed President Jeff Schmid publicly raised the question of a “too-big-to-fail AI ecosystem” in September. Nearly every participant—from sponsors and banks to issuer-paid rating agencies and promoters holding stakes in the labs—has an incentive to keep the music playing until they can exit.
The report also explicitly lists the conditions that would falsify its thesis: tenant CDS spreads retreat and remain narrow while lab valuations hold up. That has happened before—CoreWeave’s CDS fell about 40% between December and May before widening again. If hyperscaler CDS continues to narrow as they take on projects that weaker tenants cannot finance, that would indicate that the buildout has greater carrying capacity than CDS implies, and the thesis is either premature or wrong. If spreads continue to widen, the credit ceiling is approaching.
Paulson’s assessment had three components: weak underwriting, excessive leverage, and a fundamental mispricing of credit risk. The report argues that the AI buildout has all three: underwriting that treats agency ratings as gospel, leverage of 85% to 95% on unfinished buildings, and an entire buildout financed as single-A but trading as double-B. In the report’s own words: “In a highly leveraged system, you do not need a default to wipe out the equity.” Risk Warnings and Disclaimers
Markets involve risk, and investments should be made with caution. This article does not constitute personal investment advice, nor does it take into account any individual user’s particular investment objectives, financial situation, or needs. Users should consider whether any opinions, views, or conclusions in this article are appropriate to their specific circumstances. Anyone investing on this basis does so at their own risk.