←Story detail

Trending story

Airsys proposes the PCE metric in an OCP paper

1 reports1 story updatesUpdated Oct 21 17:00

Understand this story

AI overview

Airsys Cooling Technologies proposes a new metric, PCE (Power Compute Effectiveness), in a paper for the Open Compute Project, used to measure the proportion of provisioned power in a data center that is actually available for computing, rather than the portion consumed by supporting systems such as cooling and power distribution. The paper gives an example: if 70 MW of a 100 MW facility can be used for computing, the PCE is 0.70; by retrofitting to reduce the supporting load to 20 MW, the PCE can be raised to 0.80 without increasing total power. The two examples given in the paper are 0.705 for a 20 MW colocation site and 0.79 for a 100 MW hyperscale campus, and it notes that there is currently no industry average.

AI-generated from public reports

Latest development · Report

English translation is being prepared.

Developments

1 confirmed developments

  1. English translation is being prepared.

    Source:Data Center Knowledge

Reports and discussion timeline

Browse reports and discussion by time. Their evidence levels remain distinct.

Oct 21

  1. data_center_knowledge

    English translation is being prepared.

Related stories

  1. Related storiesTPCA chairman predicts Taiwan's circuit board industry output value will exceed one trillion for the first time in 2026
  2. Related storiesDell CEO warns memory supply tightness will worsen further in 2027
  3. Related storiesVultr announces deployment of a 20MW AMD MI355X GPU cluster in Chennai
  4. Related storiesJitai Technology Reaches Strategic Cooperation with Eli Lilly Worth Up to US$1.1 Billion