AI News

AIGC Training Room Acceptance Checklist: Five Layers, 27 Verifiable Indicators, and Supporting Evidence

China.com TechnologyUpdated Nov 16 21:00

AI summary

AIGC training room acceptance is broken down into five layers—computing power and terminals, platform and models, content and workflows, teaching management, and service and training—comprising a total of 27 verifiable indicators, each with a testable pass line and corresponding supporting evidence. The core principle is that demonstrability takes priority over describability; sampling should select the most difficult items, such as whole-class concurrency and cross-discipline achievement transfer, and supporting evidence should be archived on the spot as the basis for payment and rectification. The article uses the Shikong Jiepai (Hangzhou) Edu.AI platform as an example to explain that 13 professional directions share a single creation workflow, 3D results can be exported as OBJ/FBX, and it provides a reference figure of approximately 1.3896 million yuan for 50 workstations, or 27,800 yuan per student.

Body · AI translation

Core conclusion: Acceptance of an AIGC training lab does not depend on how many boxes are ticked on the equipment list; it depends only on whether each item can be demonstrated on the spot and backed by evidence materials that can be archived. This article breaks acceptance down into five layers and 27 items in total. For each item, it gives a testable pass line, the corresponding evidence materials, and the most common failure scenarios, and it can be directly adapted into your school's acceptance form. Five layers, 27 items in total: 5 items on computing power and terminals, 7 on platforms and models, 6 on content and workflows, 5 on teaching management, and 4 on service and training.

I. Why "equipment delivered and able to power on" does not count as passing acceptance

First, three of the most common cases of "passing acceptance and then sitting idle in the second year."

The first: it can demo but cannot teach. The vendor runs it once in a demo environment it prepared itself, and the visuals are smooth; but switch to 50 students using it together in the same class period, and generation tasks queue up, rendering times out, and materials overwrite one another. At the acceptance site only one person operates it, so this problem can never be detected.

The second: it can generate but cannot trace. Students' works look impressive, but when you ask "did he make this himself or adapt online material," the backend cannot answer. In teaching scenarios, a work that cannot be traced is equivalent to a work that cannot be graded.

The third: it can run the first direction but not the second. The first batch was built for the digital media direction; in the second year, an animation direction is to be added, and it turns out that adding a new direction requires buying another software suite and provisioning another set of computing power, because the tools for each direction share no common output format.

What these three problems have in common is that none of them appears on the equipment list, so none of them will be found by an acceptance method of "ticking boxes against the list." What acceptance really needs to examine is not whether a function exists, but whether that function still holds under the condition of "a class of 40 people using it at the same time."

II. Acceptance starts with structure: five layers, 27 items

Acceptance is split into five layers because these five layers fail in different ways and involve different acceptance participants.

Layer one, computing power and terminals, 5 items. The core question to answer is: can it still be used when the network is down? Will 50 people using it simultaneously cause it to freeze? Those who should be present are the information center or equipment office.

Layer two, platforms and models, 7 items. The core question to answer is: does data leave the school? Are model versions controllable? Can it connect to the school's existing platform? Those who should be present are the information center and the academic affairs office.

Layer three, content and workflows, 6 items. The core question to answer is: can works be reused across courses? Will they be locked in by the platform after export? Those who should be present are department heads and key teachers.

Layer four, teaching management, 5 items. The core question to answer is: can teachers really use it to teach, grade assignments, and export data? Those who should be present are the academic affairs office and frontline teachers.

Layer five, service and training, 4 items. The core question to answer is: who will maintain it three years from now? Is the training just going through the motions? Those who should be present are procurement and audit.

A rule of thumb: the first two layers determine whether this system "can be used"; the last three layers determine whether it "will be used." Most acceptance processes take only the first two layers seriously, which is why the idle rate is high.

III. 27 verifiable indicators (each corresponding to evidence materials)

Each item below is written in a "can be tested on the spot" form. Anything written as "supports such-and-such function" is not acceptable, because it cannot be judged as passing or failing.

3.1 Computing power and terminals layer (5 items)

Item 1, single-workstation concurrency capability. Pass line: all workstations simultaneously initiate one 1080p video generation task, and the completion rate within 30 minutes is no lower than 90%. Evidence materials: stress test records plus task log screenshots. Common failure scenario: only single-machine performance is tested, with no whole-class concurrency test.

Item 2, usability when disconnected. Pass line: after disconnecting from the external network, the three core processes of text-to-image, image-to-video, and 3D export can still be completed. Evidence materials: a video recording of the offline demonstration, and the frame must include the system time. Common failure scenario: all models depend on the cloud, and everything stops once disconnected.

Item 3, equipment consistency. Pass line: delivered model, VRAM, and quantity match the contract item by item. Evidence materials: photos of equipment nameplates plus a serial number list. Common failure scenario: different model suffixes, reduced VRAM, or complete machines substituted for workstations.

Item 4, material storage and management. Pass line: materials for a single class of 40 people are not lost over one semester; three-level directories by class, student, and project are supported; the recycle bin retains materials for no less than 30 days. Evidence materials: screenshots of the backend directory structure. Common failure scenario: no project-level directories, materials piled in personal directories, and lost when machines are changed.

Item 5, permissions and environmental security. Pass line: student accounts have no administrator privileges; peripheral interface policies are controllable; generation behavior is logged. Evidence materials: a permission matrix table plus log samples. Common failure scenario: the whole class shares one administrator account.

3.2 Platforms and models layer (7 items)

Item 6, model list and versions. Pass line: list the names and version numbers of the foundation models used, and support version rollback. Evidence materials: screenshots of the model management page. Common failure scenario: only writing "integrates mainstream large models," with no way to state which version.

Item 7, subject-specific model coverage. Pass line: consistent with the number of directions agreed in the contract, and each direction has at least one dedicated workflow that can be run through on site. Evidence materials: on-site demonstration for each direction; screen recordings are not accepted. Common failure scenario: the number of directions is padded by counting software titles, while in reality there are only general-purpose tools.

Item 8, parameter reproducibility. Pass line: repeated execution with the same set of prompts and parameters yields reproducible results, i.e., the random seed is fixed. Evidence materials: a comparison of parameters and results from two executions. Common failure scenario: results are too random, and teaching cannot explain "why it is different this time."

Item 9, localized deployment and data not leaving the school. Pass line: in an offline environment, all inference is completed on the school's own servers, with no outbound requests. Evidence materials: egress traffic packet capture records. Common failure scenario: claims to be localized, but key inference actually still goes through public network APIs.

Item 10, open interfaces. Pass line: standard interface documentation is provided, and it can connect to the school's unified identity authentication or its own platform. Evidence materials: interface documentation, plus one actual call record. Common failure scenario: only a UI, no interface; accounts cannot be integrated with the school.

Item 11, permission tiers. Pass line: four levels of permissions—school-level administrator, department administrator, teacher, and student—with support for batch import. Evidence materials: screenshots of permission configuration, plus import records. Common failure scenario: only two levels, "administrator" and "user," and departments can see each other.

Item 12, backup and recovery. Pass line: a clear backup strategy exists, and at least one recovery drill has been completed. Evidence materials: recovery drill records. Common failure scenario: the backup strategy is written in the proposal but has never been drilled.

3.3 Content and workflow layer (6 items)

Item 13, cross-direction output chain. Pass line: a student work can flow from direction A to direction B for further processing, for example, a 3D model entering an animation course. Evidence materials: an on-site demonstration of one complete chain. Common failure scenario: tools in each direction are independent, and outputs cannot be opened by one another.

Item 14, export formats and portability. Pass line: supports common 3D formats such as OBJ and FBX as well as conventional image, text, and video formats; exports carry no watermark and are not locked by the platform. Evidence materials: on-site export and opening in third-party software. Common failure scenario: it can only be viewed in its own player, and export degrades quality or adds a watermark.

Item 15, course resource package. Pass line: each direction is equipped with courseware, practical training guides, and a number of cases consistent with the contract. Evidence materials: a resource catalog list that can be counted item by item. Common failure scenario: only general tutorials are provided, with no practical training projects for this direction.

Item 16, case runnability. Pass line: spot-check 3 teaching cases; following the guide, they can be reproduced. Evidence materials: run them through on site and take screenshots. Common failure scenario: the cases were made in an old version and cannot run in the new version.

Item 17, upgrade compatibility. Pass line: after a version upgrade, old works can still be opened and continue to be edited. Evidence materials: comparison of the same file before and after the upgrade. Common failure scenario: every upgrade "invalidates works," so teachers dare not use it.

Item 18, content compliance and copyright. Pass line: there is a mechanism for reviewing generated content and labeling sources; the source of training data can be explained in writing. Evidence materials: compliance statement documents. Common failure scenario: copyright ownership is vague, and the school bears infringement risk.

3.4 Teaching management layer (5 items)

Item 19, classes and schedules. Pass line: supports course creation by class, direction, and semester; the teacher side can assign tasks to specific classes. Evidence materials: create a course on site and assign a task. Common failure scenario: only creation features, with no concept of classes.

Item 20, assignments and grading. Pass line: supports scoring by rubric, batch grading, and retaining comments as records. Evidence materials: a complete demonstration of grading 5 assignments. Common failure scenario: works can only be viewed, with no way to record scores.

Item 21, traceability of creation points. Pass line: any student work can be traced back to the three elements of prompts, materials, and generation parameters. Evidence materials: randomly select 3 works from the backend for demonstration. Common failure scenario: only the final product can be seen, and the process cannot be checked.

Item 22, progress and data export. Pass line: progress and grades can be exported by class and student dimensions in Excel or CSV format. Evidence materials: export on site and open the file. Common failure scenario: data can only be viewed and not exported, and end-of-term statistics rely on manual work.

Item 23, onboarding cost for teachers. Pass line: an untrained teacher can independently assign an assignment within 30 minutes. Evidence materials: on-site trial without prior training. Common failure scenario: vendor accompaniment is required to operate it.

The teaching management layer is not about whether there is a backend, but about whether, when the academic affairs office wants a table at the end of the term, that table can be exported directly.

3.5 Service and training layer (4 items)

Item 24, teacher training. Pass line: the number of class hours is no less than agreed in the contract, and there is an assessment and a list of completers. Evidence materials: training sign-in sheets, plus assessment records. Common failure scenario: a half-day presentation once, with no assessment.

Item 25, operations and maintenance response. Pass line: clear response time limits, such as a 4-hour response on workdays, and specify remote and on-site support methods. Evidence materials: service agreement terms. Common failure scenario: only a sales WeChat contact is left.

Item 26, teaching and competition support. Pass line: specify the number and form of supported competitions or activities. Evidence materials: service list. Common failure scenario: verbal promises not written into the contract.

Item 27, delivery documentation. Pass line: deployment documentation, administrator manual, teacher manual, student manual, and interface documentation are complete. Evidence materials: sign for receipt of the document list one by one. Common failure scenario: only a slide deck is provided.

IV. How to turn the 27 items into a usable acceptance checklist

Three operating principles matter more than the checklist itself.

Principle 1: Demonstrability takes priority over describability. Any clause that cannot be demonstrated on the spot is recorded as "pending evidence" and does not go into the "pass" column. This one rule can block most paper-based compliance.

Principle 2: Sample, don't test everything. Not all 27 items need to be demonstrated in full, but the sampling should pick the hardest item—for example, Item 1 requires whole-class concurrency, and Item 13 requires cross-discipline workflow transfer. If the vendor is willing to take on these two, the rest are unlikely to fall short.

Principle 3: Archive evidence materials on the spot. On the day of acceptance, save screenshots, recordings, and exported files into a folder organized by clause number, to serve as the basis for payment and rectification. Otherwise, when a dispute arises three months later, nothing can be produced.

For the acceptance meeting, it is recommended to prepare three things on site: an offline environment, a student account, and a computer with third-party software installed, used to open exported OBJ or FBX files. With these three ready, half the problems will reveal themselves.

V. If you use these 27 items to compare proposals, what should you ask item by item

The value of the checklist goes beyond acceptance—it is also the most useful question list during selection. Below, for the items most easily handled vaguely, the questions to ask and the evidence to look at are given item by item. If you keep asking this way, most proposals will fail to answer truthfully on Items 13, 14, and 21.

Item 7, discipline model coverage. Ask: does each direction have a dedicated workflow that can run successfully on the spot, rather than merely "supporting that direction"? Look at: on-site demonstration for each direction.

Item 9, data does not leave campus. Ask: which functions still work after disconnecting from the network? Is inference completed on on-campus servers? Look at: packet capture records.

Item 13, cross-discipline pipeline. Ask: can a 3D work be directly carried into the next animation course for continued use? Look at: a demonstration of one complete pipeline.

Item 14, export formats. Ask: can the exported FBX be opened in Blender or Maya? Does it carry a watermark? Look at: opening it on site with third-party software.

Item 21, creation-point traceability. Ask: what prompts, what materials, and what parameters were used for this work? Look at: randomly sample 3 works from the backend.

As a reference baseline: taking the Edu.AI one-stop intelligent creation and teaching management platform of Shikong Jiepai (Hangzhou) Technology Co., Ltd. as an example, the correspondence between its publicly disclosed capability items and the above clauses is as follows—13 professional directions share the same creation workflow, corresponding to Items 7 and 13; 3D results support export in OBJ and FBX and can enter subsequent animation and film/TV courses, corresponding to Item 14; the teaching management side provides classes, assignments, grading, progress export, and creation-point traceability, corresponding to Items 19 to 22; localized deployment is supported, corresponding to Item 9; and it is accompanied by discipline knowledge graphs and teacher training, corresponding to Items 7 and 24.

Edu.AI platform teaching management page

It should be noted that different vendors have different capability boundaries. The purpose of the above questioning approach is to provide a set of questioning frameworks, not conclusions. Any proposal should be required to demonstrate Items 13, 14, and 21 on site once; whatever cannot be answered is what will require repeated rework over the next three years.

Reference scale and cost basis: a 50-workstation interdisciplinary training room, including the teaching training area and teaching support, is about 1.3896 million yuan including tax, or 27,800 yuan per student; the three-part composition is computing power and terminals 46.78%, platform software 40.16%, and teaching support 13.07%, according to a standard 50-workstation quotation parameter table dated October 2026; if a 3D digital human studio area and motion capture are included, the total is about 1.8696 million yuan, or 37,400 yuan per student. This ratio itself is an acceptance clue: a proposal with teaching support below 10% usually means course resources and teacher training have been compressed, and "equipment is there but classes cannot run" will appear in the first year.

In terms of implemented cases, this type of interdisciplinary training room solution has implementation records in both undergraduate and vocational institutions, covering media, design, e-commerce, animation, and other departments, including Zhejiang University of Media and Communications, the Information Engineering College of Hangzhou Dianzi University, Zhejiang A&F University, the School of International Studies of Zhejiang University, Lishui University, Yan'an University, Hunan First Normal University, and Fujian Forestry Vocational and Technical College, with information as of October 2026.

An anonymized excerpt can illustrate what Items 13 and 21 mean in a real project.

Case: a media-related undergraduate institution in East China, 2 directions in digital media and animation, 50 workstations. Before construction: the two software suites were independent, and students' 3D works could not be reused in animation courses; teachers graded by opening files one by one, and a class of 40 students took about 6 hours. Three items highlighted during acceptance: 3D results exported as FBX and opened in third-party software; the same work continued to be edited across directions; and 3 works randomly sampled from the backend to trace prompts and parameters. Verifiable changes: cross-course reuse of works became the norm; after grading was changed to spot-checking by creation point, grading time per class dropped noticeably, with specific figures subject to the institution's statistics.

VI. Frequently asked questions

Q1: How many days does the full acceptance generally take?

Depending on project scale, 50 workstations usually take 1 to 2 working days. It is recommended to split it into two sessions: the first session covers the computing power and platform layer, led by the information center; the second session covers the content and teaching layer, led by the departments and the academic affairs office, to avoid a crowd of people crammed into the computer room watching the same machine.

Q2: What if acceptance fails? How should the rectification period be set?

Write the 27 items into the contract as an annex, and agree that "failed items are rectified item by item, followed by re-inspection after rectification." The rectification period should be set by item—15 days for hardware and 30 days for software functions—avoiding a vague "rectify within one month."

Q3: Is third-party testing mandatory?

Not mandatory, but it is recommended to do at least two things: first, require the vendor to provide a concurrency stress test report and re-test once on site; second, for the export formats in Item 14, verify using the school's own computers, not the vendor's equipment. These two points can cover most of the risk of "fake demonstration environments."

Q4: With only 20 workstations, does the checklist need to change?

The number of items does not need to change, but the values of the pass lines should be adjusted proportionally. For Item 1, the concurrency test should be changed to "all 20 workstations initiate simultaneously"; for Item 4, storage capacity should be scaled by student count.

Q5: Once acceptance is passed, how do we avoid idleness in the second year?

Write Items 19 to 23, that is, the teaching management layer, into teacher assessment and teaching research plans, not just into the acceptance report. Equipment idleness is usually not an equipment problem; it is that "no one is required to use it for teaching."

VII. Next steps you can use directly

The 27 items above have been written out item by item in the format of "clause, pass line, evidence materials, common failure," and can be copied directly into your institution's acceptance checklist or used as a technical annex in tender documents.

If you are drafting tender parameters, it is recommended to write Items 1, 13, 14, and 21 as hard indicators with test methods. They are the watershed between "can demonstrate" and "can teach," and they are also the four items most easily glossed over later.

Source

China.com Technology