AI News

Investment in the "Six Networks" to Exceed 7 Trillion Yuan in 2026: How Can Urban Renewal Absorb It

HuxiuUpdated Nov 16 19:52

AI summary

In 2026, investment in the construction of the "Six Networks" and related key areas will exceed 7 trillion yuan, of which 160 billion yuan in ultra-long-term special government bonds will be directed toward urban underground pipeline network renovation. Urban renewal loans are being tightened simultaneously: no new local government hidden debt may be added, and repayment cash flow must cover both principal and interest. Cities need to, amid stock upgrading and incremental layout, convert pass-through investment into local industrial and living momentum.

Body · AI translation

[[**Investment in the construction of the "Six Networks" will exceed 7 trillion yuan in 2026, yet urban renewal loans are tightening, and financing is shifting toward the projects' own revenue. Cities need to upgrade existing assets and plan new additions, turning transit investment into local industrial and living momentum.**

**Key points**

**1. Financing shifts to project self-repayment, with Six Networks investment providing a backstop**

Loans may not create new hidden debt, and cash flow must cover principal and interest; investment in the Six Networks will exceed 7 trillion yuan in 2026, with 160 billion yuan in special treasury bonds going to underground pipe networks.

**2. Cities must seize the elements for implementing the Six Networks**

The state manages the backbone, while cities are responsible for nodes such as distribution rooms, charging piles, delivery stations, and computing power rooms, and must bind them to local industry and living needs during the window period.

**3. Upgrading existing assets requires careful accounting and multi-network integration**

Pipe networks total 3.9 million kilometers; during the 15th Five-Year Plan, 770,000 kilometers will be renovated, with investment of about 5 trillion yuan; Hunan's "comprehensive one-time renovation," Shanghai's "special treasury bonds + China Development Bank supporting financing," and Chuzhou's "one map + sensors" reduce repeated excavation. Commercial revenue along the Liangma River is about 4 billion yuan, up 37%.

**4. Incremental layout puts computing power and logistics into old spaces**

This article is from the WeChat public account: Measuring Cities, author: Hua Gao Laisi, original title: "The 7 trillion of the 'Six Networks': How Can Urban Renewal Undertake It?"

At the end of August, the National Financial Regulatory Administration and the Ministry of Housing and Urban-Rural Development issued the "Measures for the Administration of Urban Renewal Project Loans (Trial)," with a very clear signal: no new hidden debt of local governments may be created; when assessing repayment sources, cash flow must fully cover loan principal and interest, and no form of hidden government credit enhancement will be accepted.

To put it plainly, the old path of getting money through government endorsement no longer works. The financing logic of urban renewal is shifting from "relying on government endorsement" to "relying on projects earning money themselves."

However, the other side is providing a "backstop."

The National Development and Reform Commission preliminarily estimates that in 2026, the scale of investment in the "Six Networks"* and related key areas will exceed 7 trillion yuan. Among this, the most directly relevant to urban renewal is the 160 billion yuan in ultra-long special treasury bonds arranged this year, specifically for the construction and renovation of urban underground pipe networks for gas, drainage, water supply, and heating, 25 billion yuan more than last year.

Tightening on one side, backstopping on the other. What urban renewal needs to do is turn the backstop into its own development momentum.

*The Six Networks refer to the water network, new-type power grid, computing power network, new-generation communications network, urban underground pipe network, and logistics network.

To seize this opportunity, one must first see clearly how the system of the Six Networks is built. In "Thinking in Systems," there is a viewpoint: any system consists of three things—elements, connections, and functions—and none can be missing.

Looking at the Six Networks through this framework, one finds that what is built at the national level is a complete large system: trunk lines crossing rivers, provinces, and cities are the "connections"; water diversion, power transmission, computing power scheduling, and goods circulation are the "functions"; where they go and what goals they target are laid out under national coordination. Cities do not need to worry much about these.

▼

What cities really need to watch are the "elements"—distribution rooms, charging piles, communications conduit wells, delivery stations, and computing power rooms. Once the backbone network enters a city, it must always branch out into arteries and nodes, and these need to land in specific streets, communities, and factory buildings. This is the home ground of urban renewal.

Elements have a characteristic: they are the easiest to replace. Once technology upgrades or the track switches, charging piles, communications conduit wells, and delivery stations may all be replaced or eliminated. Therefore, what really matters for cities is to bind these elements to the real needs of local development during the window period, and use renewal to realize value as quickly as possible.

Take the water network. Flood control and drainage are purely public-benefit work, but what cities really want is for waterfronts to also support urban quality, stimulate spatial vitality, and bring consumption growth.

In the final analysis, during the window period of "transit construction" of the Six Networks, cities need to accomplish two things: upgrade existing assets so that old elements keep up with new needs; and plan new additions so that new elements create new needs.

First, existing assets. This funding mainly comes from national appropriations and special support, and precisely because of this, careful accounting is even more necessary so that upgrading existing assets can truly keep up with new needs.

▍Underground pipe networks

China's urban underground pipe networks have reached 3.9 million kilometers in total length, the longest in the world, but "old age and heavy arrears" are the common state: a large number of pipelines were laid in the 1980s and 1990s, the earliest batch has been in service for more than 40 years, and many are operating while ailing.

During the 15th Five-Year Plan period, the country will build and renovate about 770,000 kilometers of underground pipe networks, driving investment of about 5 trillion yuan. For a project this large, the greatest fear is repeated construction: pipe networks, communications, and power are all buried under streets and communities, and if each is dug separately and repeatedly excavated, not only is money wasted, but the renovation cycle may also be dragged out again and again.

Hunan's approach is to bundle old residential community renovation with pipe network renewal. The provincial Department of Housing and Urban-Rural Development promotes integrated planning and integrated construction of underground pipelines, municipal roads, and community renovation, implementing "comprehensive one-time renovation." In 2025, the province completed, through this "one time," 667.5 kilometers of water supply and drainage pipe network renovation, 24.0 kilometers of gas pipe networks, and 49.6 kilometers of power supply pipe networks.

Careful calculation is not only about saving money; it also includes how to manage and operate after construction. What Shanghai explores is "special treasury bonds + China Development Bank supporting financing." The Shanghai branch of China Development Bank issued more than 350 million yuan in loans in the first three quarters of this year, supporting the renewal of more than 1,500 kilometers of gray cast iron gas pipelines across 11 districts of the city.

Chuzhou, Anhui, moved 18,000 kilometers of pipelines into "one map," with more than 30,000 sensors on duty around the clock. Since the monitoring system went online, it has issued early warnings and handled more than 800 hidden dangers such as gas leaks, water supply losses, and waterlogging, following the path of "government-bank cooperation + social capital + self-generated capacity."

In old neighborhoods, this calculation has to be even more precise. Shiquan Street in Suzhou is a 2,004-meter-old street with more than 600 shops, 82% of which are privately owned.

The Gusu District government spent all the construction and installation costs on the public parts: burying utility lines underground, separating rainwater and sewage, widening sidewalks to 7 to 8 meters, and adding more than 720 new non-motor vehicle parking spaces. After the renovation, revenue at specialty merchants increased by about 50%, rental income rose by more than 300%, and 150 million yuan in social capital investment was leveraged.

When installing charging piles in old residential communities, what often gets stuck is not money, but distribution capacity.

At Xinliuxi Garden in Wujiang, Suzhou, a relocation resettlement community with 1,335 households, 23 charging piles were installed. The piles are linked with sensing equipment in the distribution room: charging power is lowered during peak electricity use and charged at full power during valleys. Without increasing the capacity of distribution transformers, the maximum number of installable piles can be increased by up to 3 times, while also saving about 400,000 yuan in renovation investment.

The project adopts "unified construction and unified service." Residents and the community do not pay, and the community does not need to set aside separate space to build a distribution room.

Charging difficulties can be alleviated through operational scheduling, and capacity does not necessarily have to be increased first. But "being able to install" and "being able to make money" are two different things. One operator calculated that a 12-bay station earns 9,320 yuan a month, with electricity, depreciation, operations and maintenance, and property management taking more than 7,300 yuan, leaving less than 2,000 yuan at the end of the month.

Therefore, the positioning of community charging should be an extension of public services. Cities should first establish rules on revenue sharing, safety, and maintenance responsibilities, let operating companies bear the equipment investment, and not presume that it is a business with generous returns.

For water networks in rivers in central urban areas, the value lies not in navigation, but in the shoreline. More precisely, it lies in whether renewal can bring back the vitality of the old urban area.

Beijing's Liangma River is an example. Water quality once deteriorated to Grade V, the worst category. From 1999 to 2017, Chaoyang District continued pollution control, but only treated the water, and conditions for tourism and sightseeing never took shape. It was not until the "Liangma River International Style Waterfront" project was launched that the positioning shifted from water treatment to activating the value of the central urban river channel.

In June 2023, the waterfront greenway under the East Third Ring Road Bridge was connected, linking the 18-kilometer greenway of "one river, two lakes" into one; shops along the route added riverside outdoor seating, CITIC Books in Qihao Building moved its main entrance from the side facing away from the river to the riverside side, and Solana built a deck restaurant. That year, commercial revenue along the banks was about 4 billion yuan, up 37% year on year, with more than 400 brands moving in.

Governance was also handed over to operations. Starting in 2020, Chaoyang District brought in a "river steward" for property-style management, and in 2023 it also brought together merchants along the route to form a commercial alliance.

There was a precondition for the success of the Liangma River: the banks already had Lufthansa, the embassy area, and Solana as a foundation, and waterfront renewal was more about reconnecting them. If a city wants to realize the value of its waterfront, it must first make coordinated plans for its advantageous resources and think clearly before acting.

At present, many cities feel sharply divergent temperatures in the economy: old growth drivers are declining, new growth drivers are rising, and they want to shed dependence on the old drivers but cannot find a handle for the moment. The good news is that new growth drivers have not been solidified or monopolized. If cities lay out their own new factors early, they have a chance to enjoy another dividend of the times.

▍Computing power moves into old factories

Spaces such as old factories have inherent advantages in floor height, load-bearing capacity, and power configuration, making them naturally suited to hosting new factors. Among them, computing power is the most typical.

In September, Shenzhen issued the country's first city-level coordinated plan for the "six networks." The reason is straightforward: there is less and less new land, and new factors need somewhere to land, so idle old spaces are the most realistic destination.

An old power plant in Mawan, Nanshan, was transformed into a Grade A data center using its existing power facilities, using waste heat from power generation for cooling and saving 12% energy; at the Honghu Water Quality Purification Plant in Luohu, underground water purification, a ground-level park, and communications and computing facilities were all installed in one place.

Another example is Hanjiang Bay in Wuhan. The park was formerly a bedsheet factory and a diesel engine factory, and now it has become the first thousand-card cluster in Wuhan's central urban area—a 1000P computing power center. Baidu AI Cloud, Tencent Cloud, and Ant Digital Technologies have moved in one after another, and 29 high-tech and cultural and creative enterprises have settled there.

It took only three months for the Baidu AI Cloud Innovation Center building to go from renovation to operation, and it now provides AI empowerment for more than 40 local enterprises.

Computing power is not only landing in factory buildings, but also in "old infrastructure." At Lianghekou in Sichuan, six computing cabins and 2,000 domestic chips were placed in existing construction tunnels of a hydropower station, with peak computing power of 600P; the tunnel's natural year-round temperature of 5°C to 10°C keeps PUE below 1.2, which is already top-tier conditions in China.

Of course, when simply comparing electricity prices and costs, eastern cities certainly do not have an advantage. The same computing power placed at hub nodes in the central and western regions benefits from lower electricity prices, looser policies, and more room in PUE requirements—

Beijing has made clear that starting in 2026 it will levy differentiated electricity prices on data centers with PUE higher than 1.35, and the "Eastern Data, Western Computing" initiative has stricter requirements for new projects: PUE below 1.2 in the west and no more than 1.25 in the east. The tighter the policy, the stricter the screening. When competing on computing power prices, the east is certainly not cost-effective.

But the calculus of computing power has never been only about electricity prices. For example, Beijing is one of the first cities in the country to obtain approval for L3-level conditionally automated driving vehicle models, which requires stronger and more timely edge computing for the internet of vehicles. Data must remain local, and reducing computing latency also requires computing centers to be local;

The same principle applies to AI companies providing inference services and financial institutions conducting real-time risk control—the closer to demand, the more valuable computing power is. Therefore, when eastern cities convert old factories into computing power facilities, they are not competing with large clusters in the central and western regions on price, but taking on the local industry needs that must run in the city.

The logistics network is the most easily overlooked dividend.

The "Logistics Network Construction Implementation Plan" first sets the tone for the entire network: integrating the four major systems of industry, transportation, municipal services, and emergency response, and promoting the integrated development of urban and rural transportation. In other words, the logistics network is not a standalone network, but public infrastructure coupled with all six networks.

The plan's focus points directly to urban renewal: using existing commercial facilities and idle properties to convert into urban distribution centers and distribution stations; "intelligent and green" sets the tone—new logistics nodes cannot merely supplement traditional freight; they must be the infrastructure of the new supply chain.

This points the way for three types of logistics nodes in cities, and the renewal priorities for each type are completely different.

The first is the city-level interchange node. For example, the Pinghu South Railway Freight Yard in Shenzhen was originally a standard freight station, and in 2018 the Guangzhou Railway Group planned a capacity expansion of three bundles and six lines.

But Shenzhen saw something else: this freight yard had become misaligned with the needs of urban life and production—traditional freight yards cannot handle the tasks urban logistics needs to do, such as distribution, cold chain, consolidation, and sorting; supporting services are scarce, and even railway freight itself cannot connect with surrounding urban traffic.

So Shenzhen, together with the Guangzhou Railway Group, pioneered the path of "over-track development over railway freight yards + layered confirmation of rights": the ground layer remains railway land, and a layer of smart logistics warehousing is built above the railway, achieving multiple certificates for one plot and stacked space.

The result is that, without touching the original freight functions, 850,000 square meters of high-standard warehousing has been squeezed out for the city. After the entire project is completed, cargo throughput is expected to reach 30 million tons by 2035, handling about 1.4 million TEUs of sea-rail intermodal transport for Shenzhen.

It can be said that although the route is planned by the state, "when this line passes through my city, how do I use it" is something the city can actively design.

The second is the district-level intelligent node. Shanghai's "15th Five-Year Plan" spells out the node scale very clearly: each district distribution station is 2,000 to 3,000 square meters, with a service radius covering a 15-minute life circle, and renovation is encouraged in combination with commercial buildings, underground floors of office buildings, and community service centers.

The words "using underground space" are especially key. They mean that logistics elements are beginning to share carriers with the underground space network and the transportation network—not each digging and building separately, but multiple networks in one.

This path has actually already been validated on the commercial side. Dingdong Maicai started in Shanghai, with front warehouses storing fresh produce in communities 1 to 3 kilometers from users; a single warehouse is about 300 square meters, with a low threshold for site selection—underground garages, idle warehouses, and mixed commercial-residential buildings can all work.

By the first half of 2020, Dingdong already had nearly 200 front warehouses in Shanghai; under the three-year action, the city had more than 500 fresh-produce front warehouses.

Meituan Lightning Warehouse follows the same logic: sites are in residential basements, idle warehouses, or mixed commercial-residential buildings, with rent at about only one-third of traditional stores, and can hold 6,000 to 10,000 SKUs—pursuing "small space, large inventory, high turnover."

The third is the terminal node of the life circle. Terminal nodes are things like smart express stations, smart parcel lockers, and community meal pickup cabinets. Among all the new elements, this is the layer residents feel most directly. But the closer to the terminal end, the thinner the profit—terminal nodes do not rely on a single high return, but on stable frequency of use.

Shanghai has already traveled this road. For example, at the China Resources Youchao Apartments in Maqiao, Minhang, in 2026 the community collected residents' suggestions through a deliberation space, and the co-governance committee passed the plan to the operator; within 3 days, smart delivery robots were on duty, with access control, turnstiles, and elevator systems all connected, and takeout delivered directly to residents' doorsteps. The change happened in 3 days, not through repeated complaints from every household.

So renewal is not about renovating the appearance of the station, but about establishing the rules of the station: who invests in equipment, who manages operations, how revenue is shared, and who bears safety responsibility must be clarified first. Only when the rules hold will enterprises dare to enter; if the rules do not hold, the nodes cannot operate.

If a city wants a share of the 7 trillion yuan cake of the six networks, it must first see clearly: which resources merely pass through here, and which can connect with local industry and citizens' lives and stay to become momentum for development. A city does not naturally gain returns just because a project lands.

The upgrading of existing stock and the layout of incremental capacity mentioned earlier are the two ways for cities to actively catch these opportunities: let old facilities keep up with today's needs, and let new facilities bring new services and new business.

In short, the key is not how much investment passes through the city, but what development momentum these investments can leave behind for the city. Channel: Finance and Economics. This content comes from the internet, original link; the views represent only the author and do not represent Huxiu's position. For copyright issues, please contact hezuo@huxiu.com, and we will verify and handle it promptly. Everyone who is changing and wants to change the world is on the Huxiu APP [ ]

Source

Huxiu