Tesla Optimus Fremont Production Line Enters Early Ramp-Up
English text is being prepared.
In its Q3 2026 earnings report, Tesla disclosed that Optimus has begun production on a new line at its Fremont, California factory, with the project status changed from "under construction" to "early ramp-up," while the Texas project remains in the construction phase. On the earnings call, Musk said the initial ramp-up will be slow, that reaching a capacity of 20,000 units per week will take at least a year or even longer, and that he expects deliveries to companies other than Tesla around the end of 2027. Tesla also plans to raise its training compute to 400 megawatts by the end of the year.
Why read this
AI score 60
Tesla's earnings report discloses the status of the Optimus production line and the mass-production timeline, which can be used to gauge the pace of humanoid robot commercialization.
Topics
Body
编译/VR陀螺
10月22日,特斯拉发布2026年第三季度财报,披露Optimus已在加州弗里蒙特工厂新产线上开始生产,项目状态由“建设中”调整为“早期爬坡”,得克萨斯州项目仍处于建设阶段。
图源:特斯拉Optimus,资料图
特斯拉表示,此次下线的机器人是公司首批达到生产质量要求的产品,现有制造工艺已被验证适用于商业化产品,但硬件设计及制造流程仍将持续迭代。
马斯克在随后举行的财报电话会上表示,弗里蒙特高产量生产线已开始早期生产,但由于Optimus属于全新产品,初期爬坡速度将较为缓慢,过程可能出现波折。他预计,实现每周2万台的生产速度至少还需一年,甚至更长时间。
对于商业化时间,马斯克预计将在2027年底左右向特斯拉以外的企业交付Optimus。同时,他也指出机器人部分设计仍需调整,以满足安全性、可靠性和使用寿命要求,要使其真正胜任开放式任务,人工智能能力也仍有大量工作需要完成。
图源:特斯拉Q3财报
此外,特斯拉计划将用于训练的算力规模在年底前提升至400兆瓦,支持汽车与人形机器人自主能力软件的开发。
投稿/爆料:tougao@youxituoluo.com
稿件/商务合作: 林南(微信 19250561593)
加入行业交流群:林南(微信 19250561593)
元宇宙数字产业服务平台
下载「陀螺科技」APP,获取前沿深度元宇宙讯息