Understand this story
On November 5, 2026, Intel released data center infrastructure for agentic AI and an integrated green power, energy storage, and computing power solution at the 9th China International Import Expo. According to a report by Zhidongxi, Intel also showcased at the same event products including the third-generation Core Ultra based on the Intel 18A process, Xeon 6+ processors, and an all-in-one token appliance, covering end-edge-cloud collaborative scenarios. The next day, IT Home · AI reported that Wang Zhicong, Chairman of Intel China, introduced at the CIIE that the green computing power pod (i.e., the integrated green power, energy storage, and computing power solution) will in the future enter western China, combine with solar and wind energy, and convert green electricity into tokens locally; the solution adopts a standard container form factor, supports multi-pod interconnection and modular expansion, and 100 computing power pods can be connected into a large computing power center, with a construction period estimated at 8 to 12 weeks. Intel also advocates moving toward 800V high-voltage direct current power supply to reduce the size of power distribution units.
AI-generated from public reports
Developments
1 confirmed developments
Reports and discussion timeline
Browse reports and discussion by time. Their evidence levels remain distinct.
Nov 6
IT Home · Artificial Intelligence
Intel China Chairman Wang Zhicong: Green Computing Pods Will Enter Western China in the Future, Converting Green Power into Tokens Locally
Wang Zhicong, Chairman of Intel China, introduced at the China International Import Expo that green computing pods (Intel's integrated green power, energy storage, and computing solution) will enter western China in the future, combining with solar and wind energy to convert green electricity into tokens locally. The solution uses a standard container form factor, supports multi-pod interconnection and modular expansion, and 100 computing pods can be connected into a large-scale computing center, with a construction period expected to be 8 to 12 weeks. Intel also advocates moving toward 800V high-voltage direct current power supply to reduce the size of power distribution units.
IT Home · AIRelated discussion
IT Home · AI joined this discussion
This post contributes to heat; it is not a formal report or confirmed fact.
Nov 5
Zhidx
Intel Exhibits at the 9th China International Import Expo, Showcasing Intel 18A Full-Stack Computing and Green Power Energy Storage Computing Solutions
At the 9th China International Import Expo, Intel is exhibiting products including the third-generation Core Ultra and Xeon 6+ processors built on the Intel 18A process, as well as Token All-in-One machines, covering device-edge-cloud collaborative scenarios. The Xeon 6+ features up to 288 efficiency cores and 576MB of L3 cache, with a single chip capable of stably supporting more than 1,000 agents; a single Token All-in-One machine can run trillion-parameter large models. Intel has operated in China for 41 years and has built an open ecosystem with more than 15,000 partners.
Phoenix Tech
Intel Showcases Intel 18A Products at CIIE, Unveils Green Power Energy Storage Computing Solution
At the 9th China International Import Expo (CIIE), Intel showcased its third-generation Core Ultra (Panther Lake), third-generation Core (Wildcat Lake), and Xeon 6+ processors built on the Intel 18A process, and unveiled data center infrastructure for agentic AI along with an integrated green power energy storage computing solution. Xeon 6+ is the first data center CPU built on this process, featuring up to 288 efficiency cores and 576MB of L3 cache, with a single chip capable of reliably supporting more than 1,000 agents. The green power energy storage computing solution uses a container design, with each cabin housing 12 standard racks and supporting deployments from 100 kilowatts to several megawatts, with equipment able to enter operation within as little as one week of arrival on site.
Heat trend for this story
- Current
- 18
- Period peak
- 23 Nov 6 12:00
- 24-hour change
- —
Move the pointer or select the chart to inspect hourly heat. Use the left and right arrow keys with a keyboard.